2018 – Stena Germanica

2018 – Stena Germanica

We are following up on the sister ship conversion last year with a similar installation onboard Stena Germanica. Stena Germanica has been refitted with new PLC:s, new computers and new network controls the ventilations / Heating / Cooling in the accommodation, cargo...
2017 – Tunnel scada maintenance

2017 – Tunnel scada maintenance

This year we have been performing consultancy services in tunnel automation system. These systems are based on redundant Intellution iFIX. Our part in this has been to do continous updates and service in these systems. Also we have done a general comparison in order...
2017 – Stena Danica

2017 – Stena Danica

Project Description: Like many of today’s ferry operators Stena Line operates some routes with reduced speed and reduced number of engines. Taking advantage of this, we fitted the relevant pumps with speed control for reduced power. This is what the project...
2014 – WALLENIUS MACHINERY VENTILATION CONTROL, ONGOING

2014 – WALLENIUS MACHINERY VENTILATION CONTROL, ONGOING

We have installed ventilation demand control for the machinery spaces on a number of Wallenius ships. Conditions are controlled by means of pressure and temperature. Frequency drives on all engine room fans has been installed. Vessels with upgraded ERVC system until...