2013 – DFDS Pearl Seaways

2013 – DFDS Pearl Seaways

Project description: In the spring of 2013 DFDS Seaways decided to upgrade the HVAC system onboard m/s Pearl Seaways by having the control system replaced. CATC (short for “control at sea”) won the project.  The old system of ABB type suffered from communication...
2012 – Stena Saga

2012 – Stena Saga

Project scope: CATC has installed a control system for the engine rooms, controlling the supply air to the engines. By this function, energy is saved and the engines will be provided with the exact amount of air needed.