2015 – STENA LAGAN

2015 – STENA LAGAN

Project Description: Stenaline is continuously improving the fuel efficiency and reducing the emissions from its fleet. In this process we were awarded a project to implement demand control for the engine air supply. The system we installed monitors and controls the...
2015 – STENA SUPERFAST X

2015 – STENA SUPERFAST X

Project Description:Stenaline is continuously improving the fuel efficiency and reducing the emissions from its fleet. In this process we were awarded a project to implement demand control for the engine air supply. The system we installed monitors and controls the...
2014 – AIDAcara

2014 – AIDAcara

Scope: The entire HVAC control system was replaced with a state of the art distributed PLC control system. The modification was motivated by efforts at power savings, and by the fact that the old system was obsolete. Each air handling unit control panel was modified...
2014 – Stena Adventurer

2014 – Stena Adventurer

Scope: The StenaLine Superferry “Adventurer” was upgraded with a new HVAC Control system, Seawater pump Control system and Engine room pressure and temperature control system. A new decentralized PLC system was installed, integrating all the logic. The...
2014 – Stena Scandinavica

2014 – Stena Scandinavica

Project Description: The Stena Scandinavica is one of the biggest ships in the fleet. Stenaline is continuously improving the fuel efficiency and reducing the emissions from its fleet. In this process we were awarded a project to implement demand control for the...
2013 – Fuel monitoring system

2013 – Fuel monitoring system

Installing Emerson fuel metersInstalling power meters in switchboardsInstalling and programmingDelivery of data collection cabinets for Fuel, Power, Engine and navigation data for reporting to NAPA loading...