by admin | Oct 24, 2016 | MARINE
A new energy efficient HVAC control system was installed during ship’s normal operation. The old system was starting to fail and had to be replaced. A new Ethernet network was installed and new sensors were installed, all new sensors of Modbus communicating...
by admin | Oct 24, 2016 | MARINE
Main purpose of project was to save energy, integrate more equipment and modernize system. Short description of system: A new energy efficient HVAC control system was installed during ship’s normal operation. The ship has since it was built been extended, and new air...
by admin | Dec 29, 2015 | MARINE
A new energy efficient HVAC control system was installed during ship’s normal operation. The old system was starting to fail and had to be replaced. A new Ethernet network was installed and new sensors and actuators were installed. The existing modbus...
by admin | Nov 17, 2015 | MARINE
Project description This project was carried out during ship’s normal operation. The entire ship HVAC control system was replaced with a state of the art decentralized PLC control system. Frequency drives and plenty of new sensors and actuators...
by admin | Nov 17, 2015 | MARINE
DFDS King and Princess seaways are sisters and the project included both ships. The HVAC control system was replaced during ship’s normal operation. The new PLC based decentralized control system was programmed for energy efficiency and passenger and crew...
by admin | Jun 15, 2015 | MARINE
Project Description: Stenaline is continuously improving the fuel efficiency and reducing the emissions from its fleet. In this process we were awarded a project to implement demand control for the engine air supply. The system we installed monitors and controls the...