by admin | Nov 1, 2018 | MARINE
During the end of 2018 we finalized the turn-key installation on Stenalines Mecklenburg-Vorpommern. The scope was fan speed control of accommodation areas and pressure-temperature control of engine rooms.
by admin | Aug 30, 2018 | MARINE
This accommodation platform was refitted with a new PLC control system for the complete accommodation area. A network was also installed to allow for control room monitoring and control.
by admin | May 31, 2018 | MARINE
During 2018 we installed a new control system for the heating, ventilation and cooling on Color Magic. The old PLC system had become obsolete and the new system enabled many new energy saving features such as CO2 control, time based control, fan and pumps speed...
by admin | Feb 21, 2018 | MARINE
We are following up on the sister ship conversion last year with a similar installation onboard Stena Germanica. Stena Germanica has been refitted with new PLC:s, new computers and new network controls the ventilations / Heating / Cooling in the accommodation, cargo...
by admin | Jun 9, 2017 | MARINE
Project Description: Like many of today’s ferry operators Stena Line operates some routes with reduced speed and reduced number of engines. Taking advantage of this, we fitted the relevant pumps with speed control for reduced power. This is what the project...
by admin | Oct 24, 2016 | MARINE
We have installed ventilation demand control for the machinery spaces on a number of Wallenius ships. Conditions are controlled by means of pressure and temperature. Frequency drives on all engine room fans has been installed. Vessels with upgraded ERVC system until...