2015 – King & Princess Seaways

2015 – King & Princess Seaways

DFDS King and Princess seaways are sisters and the project included both ships. The HVAC control system was replaced during ship’s normal operation. The new PLC based decentralized control system was programmed for energy efficiency and passenger and crew...
2015 – STENA MERSEY

2015 – STENA MERSEY

Project Description: Stenaline is continuously improving the fuel efficiency and reducing the emissions from its fleet. In this process we were awarded a project to implement demand control for the engine air supply. The system we installed monitors and controls the...
2015 – STENA LAGAN

2015 – STENA LAGAN

Project Description: Stenaline is continuously improving the fuel efficiency and reducing the emissions from its fleet. In this process we were awarded a project to implement demand control for the engine air supply. The system we installed monitors and controls the...
2015 – STENA SUPERFAST X

2015 – STENA SUPERFAST X

Project Description:Stenaline is continuously improving the fuel efficiency and reducing the emissions from its fleet. In this process we were awarded a project to implement demand control for the engine air supply. The system we installed monitors and controls the...
2014 – AIDAcara

2014 – AIDAcara

Scope: The entire HVAC control system was replaced with a state of the art distributed PLC control system. The modification was motivated by efforts at power savings, and by the fact that the old system was obsolete. Each air handling unit control panel was modified...