2014 – WALLENIUS MACHINERY VENTILATION CONTROL, ONGOING

2014 – WALLENIUS MACHINERY VENTILATION CONTROL, ONGOING

We have installed ventilation demand control for the machinery spaces on a number of Wallenius ships. Conditions are controlled by means of pressure and temperature. Frequency drives on all engine room fans has been installed. Vessels with upgraded ERVC system until...
2016 – STENA SPIRIT

2016 – STENA SPIRIT

A new energy efficient HVAC control system was installed during ship’s normal operation. The old system was starting to fail and had to be replaced. A new Ethernet network was installed and new sensors were installed, all new sensors of Modbus communicating...
2016 – STENA SCANDINAVICA

2016 – STENA SCANDINAVICA

Main purpose of project was to save energy, integrate more equipment and modernize system. Short description of system: A new energy efficient HVAC control system was installed during ship’s normal operation. The ship has since it was built been extended, and new air...
2015 – STENA VISION

2015 – STENA VISION

A new energy efficient HVAC control system was installed during ship’s normal operation. The old system was starting to fail and had to be replaced. A new Ethernet network was installed and new sensors and actuators were installed. The existing modbus...
2015 – Superstar Aquarius

2015 – Superstar Aquarius

  Project description   This project was carried out during ship’s normal operation. The entire ship HVAC control system was replaced with a state of the art decentralized PLC control system. Frequency drives and plenty of new sensors and actuators...